
August 28, 2026
Not every kitchen needs new cabinets. WE DO Interior Design & Fit-Out scopes every kitchen renovation Dubai project into one of three levels: a vinyl wrap, a refacing, or a full replacement, priced separately, so you're never quoted for more than your kitchen actually needs. From modular kitchen installations in Dubai to full custom remodels, our in-house team handles design, cabinetry, and installation under one contract for apartments across the city.




Ready to plan your Kitchen renovation? Contact WE DO for a free site visit and itemized quote.
A kitchen renovation touches plumbing, electrical, cabinetry, and appliances all in one room; more can go wrong here than in almost any other part of an apartment, which is exactly the gap this kitchen renovation company in Dubai owners keep running into when comparing quotes.
We are ISO 45001:2018, ISO 14001:2015, and ISO 9001:2015 certified formal systems for safety, environment, and quality management, which can be checked together with winning the Luxury Lifestyle Awards 2026. All of it comes along with our DED registration and more than 250 successfully finished projects both for residential and commercial areas in Dubai, something one could actually check.
Our company handles all aspects of design, cabinetmaking, and installation from within one fixed-price contract, without the need to worry about coordinating with separate carpenters, electricians, and plumbers if things aren’t working together properly. Appliance selection and electrical requirements have been determined before the design phase, and nothing is ordered without on-site verification of every dimension.

This is the first real decision in any kitchen remodeling project in Dubai, and it comes before color, style, or cabinet brand: how much of the existing kitchen is actually worth keeping. There are three levels, not two, and WE DO scopes and prices each one separately rather than defaulting you to the most expensive option.



| Factor | Vinyl Wrapping | Kitchen Refacing | Kitchen Replacement |
|---|---|---|---|
| What changes | Vinyl film applied over existing cabinet doors | Doors, drawer fronts, hardware, countertop | Entire cabinet boxes, configuration, countertop |
| Layout changes | Not possible | Not possible; sink and appliance positions stay fixed | Possible, full redesign |
| Typical timeline | 1-3 days | Days to about a week | 2-4 weeks |
| Relative cost | Lowest | Lower | Higher |
A site visit settles this in minutes; wrapping or refacing a box that's warped from a slow leak under the sink just delays the real fix by a year.

Ready to plan your Kitchen renovation? Contact WE DO for a free site visit and itemized quote.
Open kitchen vs closed kitchen is the biggest configuration call after the wrap-reface-replace decision, and it's as much cultural as architectural. Older buildings across areas like Bur Dubai, Karama, and Al Qusais were typically built with closed, walled-off kitchens that better contain smell and noise, still preferred by households that cook daily with strong spices.
Newer developments, especially in JVC and JLT, lean toward open-plan kitchens that blend into the living space, making smaller units feel larger. As a luxury interior design company in Dubai , WE DO scope this decision at the first site visit, since it changes the electrical and plumbing plan before anything else is designed.
Neither is objectively better. A semi-open arrangement, a glass or sliding partition, open during light use and closed during heavy cooking, comes up often as a middle ground between the two.

| Factor | Closed Kitchen | Open Kitchen |
|---|---|---|
| Smell & noise control | Contained | Spreads to living areas |
| Feels larger in small units | No | Yes |
| Natural light reach | Limited | Better |
| Wall storage | More | Less |
| Structural work to convert | — | Removing a wall needs NOC |


L-shape kitchen Dubai layout is ideal for small and medium-sized kitchens and maintains an optimal work triangle. The U-shape kitchen Dubai layout is best suited for large kitchens since it makes use of the maximum possible counter and storage spaces. Single wall or galley kitchen layout is the most space-saving design suitable for studio and 1-bedroom apartments.
The small kitchen renovation Dubai and the studio kitchen renovation Dubai are projects that work best when they follow the galley kitchen layout or the single wall kitchen layout, and where appliances used are slimline with vertical storage as opposed to the use of wide base cabinets. The addition of an extension of the countertop can also help in increasing the amount of space while maintaining it as a temporary feature.
Larger apartments and penthouses sometimes include a "show kitchen", open, for light use and guests, paired with a separate working kitchen behind it for heavier cooking. It's a real option, but only where the unit has the floor area to support two kitchen zones. For a standard 1-3 bedroom apartment, one well-planned kitchen almost always serves better.

Kitchen cabinets Dubai use MDF material covered in laminate or acrylic, or solid-wood veneers for a more upscale appearance. Regarding design, the most popular choices are a handle-free, minimalistic German kitchen Dubai design, an Italian kitchen style Dubai, or a completely customized design, regardless of whether it is available at any particular showroom brand name.
Prioritizing kitchen storage solutions Dubai includes pull-out pantry cabinets, carousel corner shelves, and soft-closing drawer organizers. These will have much more impact on usability than the number of cabinets you have.




Granite or quartz is the default countertop material, while the backsplash will usually be tiled with ceramic, glass, or porcelain tiles.
Most Dubai apartments use electric or induction hobs for cooking rather than gas, which affects the electrical load calculation before cabinetry is ordered. Appliance selection should happen before the cabinetry design is finalized, not after; reversing that order is one of the most common causes of rework.



Good kitchen lighting uses three layers: under-cabinet task lighting for the countertop, a pendant or two over an island or breakfast bar, and ambient ceiling lighting for the rest of the room. Task lighting is the one most kitchens skip, and then regret.
Kitchen ventilation in Dubai means an extractor hood matched to the kitchen's size and layout, non-negotiable in a closed kitchen, where cooking heat and smell have nowhere else to go. Ducted extraction performs better than recirculating filters for regular, daily cooking.
A few kitchen renovation trends keep showing up across current Dubai kitchen briefs, beyond the standard cabinet-and-countertop choices covered above.
Push-to-open or integrated-channel handles now come up more often than visible hardware. The line reads cleaner, and it's easier to keep free of grease marks.
Upper and lower cabinets in two different finishes, often a lighter upper and darker lower, is a popular way to add visual interest without the cost of a fully custom design.

Pairing a stone or quartz countertop with a contrasting wood-finish island base is a consistent request, adding warmth to what's otherwise a hard-surface-heavy room.
Refrigerators and dishwashers finished with a matching cabinet panel, rather than visible stainless steel, are a common request at the design stage now. Adding one later usually means replacing the whole appliance rather than fitting a panel to it.
The incorporation of touchless faucets and sensor ovens, along with the installation of smart home wiring, is often discussed in the design process since retrofitting them later is more expensive than installing them from the beginning.
Using low-VOC finishes and local products, especially in cabinetry and countertops, has become an initiative that is brought up by the clients without us suggesting it.



Kitchen renovation cost Dubai depends on cabinetry extent, countertop material, appliance integration, and whether the configuration changes, rather than kitchen size alone. These figures are approximate market ranges, not a fixed quote for any specific kitchen:
| Scope | What's Included | Approximate Cost (AED) |
|---|---|---|
| Budget Kitchen Renovation Dubai | Cabinet refacing, new countertop, same configuration | around 15,000 – 35,000 |
| Mid-Range Remodel | New cabinetry, countertops, backsplash, appliances, same configuration | around 40,000 – 80,000 |
| Luxury Kitchen Renovation Dubai | Configuration change, premium materials, island, full electrical & plumbing | around 90,000 – 180,000+ |
Kitchens typically account for a disproportionate share of a full apartment renovation budget relative to their floor area, since cabinetry, plumbing, and appliances are all concentrated in one room.
Every kitchen renovation process engagement with WE DO runs through three structured phases.

It starts with a site visit, measurements, a layout assessment, and the refacing-vs-replacement decision, worked through with you on the spot. The visit itself carries no upfront charge, and the cost is waived entirely once you confirm you're moving ahead with WE DO. From there, cabinetry layout, materials, and appliance placement are finalized and visualized before anything is ordered; appliance selection happens at this stage specifically, since it determines the electrical load the cabinetry design has to work around. Where the layout changes or a wall is affected, we prepare and submit the building management NOC in parallel with design work, rather than after it.
Old cabinetry and fixtures come out first, with plumbing and electrical points capped safely, worth doing properly, since water and power lines run close together in a kitchen. New circuits and water points go in to match the finalized layout before any cabinetry is installed, since rerouting either one afterward means undoing finished work rather than adding to it. Units, countertops, and backsplash are fitted once electrical and plumbing work is complete and inspected.


Every appliance is tested, a snagging check covers the full kitchen, and your workmanship warranty begins from this date. A basic refresh typically takes under 2 weeks from start to finish; a full custom kitchen with a layout change runs 4-6 weeks, longer if imported materials are involved. This kitchen renovation timeline Dubai guide is a starting point, confirmed exactly once your scope is locked in.
1. Ordering cabinetry before confirming appliance dimensions.Appliances and cabinetry need to be sized together; ordering boxes first often means a fridge or oven that doesn't actually fit the gap left for it.
2. Not checking electrical load capacity before finalizing the design.Electric and induction cooking draw more power than gas; confirm the circuit can handle it before the kitchen is built around it.
3. Refacing a cabinet box that's actually water-damaged.New doors on a swollen or rotting box look fine for a few months, then fail. If there's been a leak, replacement is the only real fix.
4. Removing a kitchen wall without confirming it isn't load-bearing.Opening up a closed kitchen needs a structural check and a building management NOC; skip this and the wall, or the approval, can become a real problem.
5. Underestimating ventilation, especially in a closed kitchen.Poor extraction means grease buildup, lingering smell, and extra strain on the AC trying to clear the heat; cheaper to size the hood correctly the first time.

WE DO's process is built to catch all five before construction starts: appliance selection and electrical load confirmed at the design stage, structural checks before any wall comes down, and ventilation sized to the actual kitchen, not a generic default.
"Working with WeDo Interior Design has been an absolute pleasure from start to finish. Their team is creative, professional, and truly understands how to bring a space to life. From the initial consultation to the final touches, every detail was handled with care and precision."
"Amazing team, good energy, and they listen well. They go the extra mile to make sure you are happy with their service. Highly recommended."
WE DO Interior Design & Fit-Out
Dubai - X4RG+39W Jabel Ali, Jabel Ali Industrial 1 - Dubai
Phone/WhatsApp: +971588075603 | Email: info@wedointerior.ae
Book Your Consultation Online: https://wedointerior.ae/contact-us
For a budget refresh, it will cost about AED 15,000-35,000; a mid-level kitchen remodel with cabinetry and countertops will be between AED 40,000-80,000, and for complete custom kitchen remodels including layout, it will range from AED 90,000-180,000. The above prices are estimated market prices, and you should ask for a written, fixed price.
You need to check a DED-licensed kitchen renovation company that offers you a written fixed price, shows actual projects and not renders, and also provides design, cabinetry, and installation under one contract. WE DO Interior Design & Fit-Out fits all these criteria, and it has done several kitchen projects in Dubai.
Yes, it is generally worth it if the kitchen is old-fashioned, as this room is one of the first that potential tenants evaluate. However, the level of renovation should correspond to the category of the future rental income, because an over-specified luxurious kitchen will hardly pay off in the middle-income rental housing market.
It depends on the frequency of your cooking and on how many people live in your family. Closed kitchens are better for containing smells and noises, as well as for cooking every day using spicy products. Open kitchens make small apartments bigger and brighter.
If your cabinets' boxes are sturdy and the kitchen layout is fine, then you will need refacing, which is more economical and less time-consuming. In case your cabinets are damaged by water or you require a change in your kitchen layout, you should go for remodeling.
Making cabinetry orders before verifying the dimensions and electrical load requirements of your appliances, like a fridge or oven that cannot fit in a certain space and vice versa.
A basic refresh takes under 2 weeks. A full custom kitchen with a layout change typically runs 4-6 weeks, longer with imported materials.
Cosmetic changes like refacing usually don't need approval. Removing or adding a wall, or major electrical and plumbing changes, needs a building management NOC, and sometimes Dubai Municipality approval.
Generally yes, if the wall is not bearing, but it requires a NOC from the building management, as well as sometimes an engineering assessment, first.
It is the one made from pre-engineered units put together on site and not custom built from scratch, normally quicker and cheaper to install.
No, dual kitchens can only be justified in cases when the floor area is big enough for two kitchen zones; that is normally associated with large apartments or penthouses. For a regular 1-3 bedroom apartment, one good kitchen is better than dual kitchen space.